The High-tech enterprises toengaged in aluminum extrusion technology research

A型淬火设备-水帘纸-水印.jpg

The High-tech enterprises toengaged in aluminum extrusion technology research and development and Auxiliary equipment development.

Customization service process

  • 1

    Parameter survey:

    To ensure most requirements in production data from clients, at first of all, we will supply a basic data list to fill in by clients. E.g press tons or max billet diameter.

  • 2

    Technical proposal:

    We own a strong team in technology and manufacturing. To offer best customized technical proposal by many times meeting with clients, and also various inspection in clients’ production line.

  • 3

    Materials purchasing:

    Using primary brand from foreign and domestic supplier for electric system, e.g. high stability and high precision ABB inverter; protection unit, contactor, intermedia relay from SCHNEIDERThe all action and control are all managed by PLC from SIEMENS. Control panel is used touch-screen from SIEMENS and buttons from SCHNEIDER.

  • 41.png
    4

    Mechanical process:

    we own welding robot and fiber laser cutting machine are exported from overseas, those machine will ensure higher quality and precision in mechanical procedure and also improve automatic level in process.

  • 51.png
    5

    Procedure inspection:

    We built a better quality management system to manage well the whole process from design, purchase, fabrication, assembly, debugging to after-service etc.

    QC dept will inspect strictly all quality range of pipes, hose, valves, wire lines, welding, assembly etc. so as to ensure higher quality level for each one.

  • 组 454453.png
    6

    Packaging protection:

    Our company maintains a strict and responsible attitude from the first step of design to the last link, We The all packaging is inspected strictly and transport feedback from clients, we used better and more safety packaging for long time transport on sea.

  • 71.png
    7

    Safety inspection:

     After confirming that the customer's site foundation is completed in accordance with the drawings, we will arrange 2 engineers to arrive at the customer's site for assembly.  At the same time, the customer needs to arrange 2-3 technical personnel familiar with the equipment to assist the assembly on site.  

    The assembly of the quenching system is usually completed in 15-20 working days, and the assembly of the handling system is completed around 60 days.  

  • 组 44.png
    8

    Job training:

    After the successful trial operation of the equipment, our engineers will train 3-4 equipment operators and related equipment management personnel of the customer on operation, operation and maintenance. The training will be completed after it is confirmed that they have mastered both practice and theory.

Technical Interactivity

  • How to deal with the problems during production after commissioning?

    If customers encounter any problems in the follow-up production, customers can contact us at any time. The company's service hotline: +86-757-85527690 or send the company's after-sales email savesb@save-sb.com. We will reply and deal with them in time to ensure that customers solve problems as soon as possible to avoid production delay. 

  • How to maintaining equipment? What’s the process to purchase spare parts?

    We will send you a complete “Planned maintenance table”( pls view the below) which is listed the maintenance details range of day, month, year etc. if it need to purchase spare parts, pls send requirements to our company e-mail box at savesb@save-sb.com or call our service phone No. at 181 2873 1305 at any time. We warranty to feedback at first time after getting messages, normally we promise to send out the spare parts by courier next day at most.

Planned maintenance table

Maintenance termsPictureMaintenance termsThe ways of maintenance per month
1Water tankTo check water. To check filter system, the water hardness should be 3-5 degrees.Change the fresh water, to clean the water tank if possible
2Electric cabinet ( please make sure the condition of power off before maintenance )To check if the wire is connected well. To check if he door of cabinet is close or not. To check the cooling fan is running well.Clean the dust.Clean the surface of cabinet and invert. To cool 10 min. After long time running.
3Ventilator ( 40# lubricating oil )Clear the all litter around 5 meters area. To check the noise and vibration. To tighten the all screws etc.To inspect the sealing. To check the noise and vibration. To clean the outside of pump.
4Water pump( 40# lubricating oil )To inspect the sealing. To check the noise and vibration. To clean the outside of pump.To dismantle the impeller and clean it, to change a new unit if possible. To clean the all water tubes.To clean the water supply. To lubricating the bearing, to clean the waste oil.To tighten the all screws and bolts etc.
5ChainClean the dust on the chain.Lubricating. To inspect the noise and vibration.To inspect if it’s crack, worn. To inspect the wheel is firmed or not. To tighten the screws and bolts etc
6Water and mist jetsTo inspect the water supply. Clear the litter in the water.To inspect if it’s crack, worn. To inspect the wheel is firmed or not. To tighten the screws and bolts etc

Recommendations after one year - replacement parts or maintenance

Maintenance termsPictureThe ways of maintenance per year
1Water tankChange the fresh water, to clean the water tank if possible
2Electric cabinet ( please make sure the condition of power off before maintenance )Clean the dust .To check and change some new wearing parts. To tighten the power line.Clean the cabinet
3Ventilator ( 40# lubricating oil )Clean the all dust. Change a new parts.Change a fresh lubricating.change a new belt to instead of worn unit.
4Water pump( 40# lubricating oil )To repair the painting. To change a fresh lubricating. To change the damaged cooling fan and spare parts.
5ChainTo change a new chain instead of worn unit.
6Water and mist jetsChange the new nozzles instead of damaged one.